000 01487cam a2200361 a 4500
001 2142853
003 OSt
005 20210128163010.0
008 980619s1999 nyua b 001 0 eng
010 _a 98028269
020 _a0471291676 (cloth : alk. paper)
040 _aDLC
_cATU
_dDLC
050 0 0 _aTS157.5
_b.C81 1999
082 0 0 _a658.5/3
_221
100 1 _aCorrell, James G.
_911747
245 1 0 _aGaining control :
_bcapacity management and scheduling /
_cJames G. Correll, Norris W. Edson.
250 _a2nd ed.
260 _aNew York :
_bJohn Wiley,
_cc1999.
300 _axiv, 270 p. :
_bill. ;
_c24 cm.
440 0 _aOliver Wight manufacturing series
_911737
504 _aIncludes bibliographical references (p. 263) and index.
650 0 _aProduction scheduling.
_911744
650 0 _aManufacturing resource planning.
_911465
650 0 _aJust-in-time systems.
_911748
650 0 _aIndustrial capacity
_xManagement.
_911749
700 1 _aEdson, Norris W.
_911750
856 4 2 _3Contributor biographical information
_uhttp://www.loc.gov/catdir/bios/wiley046/98028269.html
856 4 2 _3Publisher description
_uhttp://www.loc.gov/catdir/description/wiley0310/98028269.html
856 4 _3Table of Contents
_uhttp://www.loc.gov/catdir/toc/onix02/98028269.html
906 _a7
_bcbu
_corignew
_d1
_eocip
_f19
_gy-gencatlg
942 _2lcc
_cBOOK
999 _c6125
_d6125