000 | 01046pam a2200277 a 4500 | ||
---|---|---|---|
001 | 1541163 | ||
003 | OSt | ||
005 | 20210118101937.0 | ||
008 | 910418s1992 nyua b 001 0 eng | ||
010 | _a 91003864 | ||
020 |
_a047152851X (alk. paper) : _c$54.00 |
||
040 |
_aDLC _cATU _dDLC |
||
050 | 0 | 0 |
_aTA177.4 _b.W21 1992 |
082 | 0 | 0 |
_a658.15/52 _220 |
100 | 1 |
_aWard, Sol A. _99102 |
|
245 | 1 | 0 |
_aCost engineering for effective project control / _cSol A. Ward. |
260 |
_aNew York : _bJ. Wiley, _cc1992. |
||
300 |
_aviii, 227 p. : _bill. ; _c24 cm. |
||
504 | _aIncludes bibliographical references (p. 215-216) and index. | ||
650 | 0 |
_aEngineering economy. _99093 |
|
856 | 4 | 2 |
_3Publisher description _uhttp://www.loc.gov/catdir/description/wiley033/91003864.html |
856 | 4 |
_3Table of Contents _uhttp://www.loc.gov/catdir/toc/onix04/91003864.html |
|
906 |
_a7 _bcbc _corignew _d1 _eocip _f19 _gy-gencatlg |
||
942 |
_2lcc _cBOOK |
||
999 |
_c4659 _d4659 |